Planning, feasibility and delivery.

A project is decided twice: once by the planning system, and once by the numbers. The work is knowing which of the two is about to say no — and what to change before it does.

What the mandate covers.

Approvals and feasibility are usually treated as two separate exercises run by two separate consultants. They are one decision, and treating them separately is how a permitted scheme ends up unbuildable.

  • Planning pathway — which route the scheme should take, what each costs in time and risk, and what has to be conceded to make it viable.
  • DA strategy — what to lodge, in what form, with what supporting material, and what to leave out.
  • Pre-lodgement and authority engagement — the issues worth resolving before an application is on the register, rather than after.
  • Feasibility modelling — revenue, cost, finance and timing assembled into a model that can be interrogated rather than merely presented.
  • Sensitivity and risk — what happens to the return if construction costs rise, values soften, the programme slips or interest moves.
  • Delivery strategy — staging, procurement, the order of work and the point at which each decision must be made.

We advise; we do not act as the architect, the planner, the builder or the financier. The value is in holding those inputs together and telling you what they mean as a whole.

Method

Where projects fail.

Not usually in the model. In the assumptions the model was built on, and in the order in which they were tested.

01 The gates a project passes

Each gate can stop the project. Testing them in order is cheaper than testing them all at once, and far cheaper than discovering the failure after the site is under contract.

01

The yield assumption

Floor space that is permitted but not efficiently usable, or saleable area that assumes a configuration the market will not pay for.

02

The cost assumption

Construction rates taken from an earlier project, contingency set too thin, and escalation ignored across a programme measured in years.

03

The programme

Approval, documentation, tender and construction compressed to the dates everyone hopes for rather than the dates the pathway supports.

04

The planning risk

An assumption that a consent will issue as lodged, when the history of the site and the council’s own decisions suggest otherwise.

05

The finance

Facility terms that assume presales or valuations the market may not deliver, and interest capitalised on a programme that slips.

06

The exit

A completion date that lands into an oversupplied market, or a product type that was in demand when the site was bought.

Questions this answers.

How long does a development application take?

It depends on the pathway, the council, the completeness of the application and whether the scheme attracts objection. A straightforward complying or low-impact proposal in an active council can move quickly; a scheme that needs variation, concurrence or resolves a contentious planning issue will not. The useful planning assumption is the one you can afford if it slips, not the one in the program.

What breaks a feasibility model first?

Usually the revenue line, because it is the one everyone wants to believe. Saleable area is overstated, price per square metre is taken from a better product in a better location, and absorption is assumed rather than evidenced. Cost escalation and programme delay come next. By the time the margin is thin, the project is already committed.

When should a scheme be redesigned rather than defended?

When the constraint is structural — height, setbacks, access, flooding or a planning principle the council applies consistently — rather than a matter of presentation. Redesign costs weeks; defending a scheme the instrument does not support costs months and often produces a worse outcome.

Enquire

Before the DA is lodged.

The cheapest place to change a scheme is before it is on the register. A short review of the pathway and the numbers is usually enough to establish whether it holds.

Private property advisory across every asset class — residential, commercial, industrial, retail, mixed-use and development.

Contact

+61 423 460 808 hello@empiresms.co

Level 8, 1 Chalmers Crescent
Mascot NSW 2020

Registered office and correspondence address only. Meetings strictly by appointment; no walk-ins.

© 2026 Empire SMS Holdings Pty Ltd · ABN 54 681 756 418 · ACN 681 756 418

Property advisory and consultancy services only. We are not licensed real estate agents, we do not hold an Australian Financial Services Licence, and we do not provide financial product advice.